ASBESTOS MANAGEMENT PLAN ANNUAL NOTICE OF AVAILABILITYThis notice serves to fulfill annual notification requirements in accordance with Section 763.93 of the Asbestos Hazard Emergency Response Act (AHERA). AHERA requires that all school buildings be visually inspected by accredited inspectors to identify all asbestos-containing building materials (ACBM) that may be present in the school, and to maintain records of all activities related to inspections, removal and maintenance of ACBM. As required under AHERA, the Lebanon School District must maintain an Asbestos Management Plan (AMP) and keep the AMP on file at each of our schools (main offices), and the School Administrative Unit Office (SAU). The AMP is available for review during school hours, Monday through Friday. The AMP details the location of asbestos in each District-owned building and provides a record of inspections, re-inspections, periodic surveillance, and removal of asbestos. Periodic surveillance of Asbestos Containing Building Material (ACBM) is conducted by District personnel every six months and a thorough re-inspection of ACBM is conducted once every three years by the District’s environmental consultant. The most recent inspection was conducted in August 2023. For additional information, please contact our Local Educational Agency Designee, the Director of Facilities at (603) 790-8500 x 1122, facilities@sau88.net. |
